Apr 22
Bids in
22 days
19128 GTRA ARFF Road Full Depth Reclamation (FDR) #17923
(T-NR-E) Work will be that associated with the ARFF Access Road Reconstruction (FDR) project which will involve full depth reclamation of the ARFF access road, concrete flume replacement, storm drainage ditch rehabilitation including regrading, storm pipe replacement, and associated pavement patching.
Status
Accepting Bids
Prebid Date | 4/2/25 1:00pm |
Bid Date | 4/22/25 1:00pm |
Company & Contacts
Neel-Schaffer | Birmingham
Josh Stump
(205) 912-8549
Location
Lowndes Co. MS (Golden Triangle Regional Airport)